I ordered the empennage kit today for a RV-14A. 6 months is the listed wait, we'll see how long it takes. Wish me luck, on to workshop, tools, and practice!
We are roughly the same stage as I will order my kit as soon as the US-Canada land border opens. Curious your decision on tool kits, different suppliers etc.
I ordered the empennage kit today for a RV-14A. 6 months is the listed wait, we'll see how long it takes. Wish me luck, on to workshop, tools, and practice!
After showing Van's my build schedule, recommendation was to place the QB fuselage order now, not taking deposits on it yet, but on the list for container scheduling. Estimated delivery is 2Q2023.
Finished the section 7 rudder trailing edge. Came out straight after using two pieces of angle, match drilled and cleco'd during adhesive cure, then took out about every 5 holes a 0.5" hole to squeeze rivets though, and followed section 5.8.