I built two EAA tables, and just happen to have some more 3/4 ply left over; enough to build another table with the top split down the middle. Soooo I'm thinking of building another EAA table, split in the center to take the DRDT-2. I could just bolt it on top, and might do that. I might also could sink the DRDT-2 down in the middle and build the top up to it at the right level. Or I could bolt the DRDT-2 onto the cross-piece 2x4s and then build the top up to the level of the dimpler.
I'm inclined to bolt it on top and fabricate a shelf just for the dimpler. Otherwise it seems it will be too low to operate easily.
Has anyone solved this problem and have any ideas about better/worse ones?
How much does it help to have the carpeted support on either side of the dimpler?
I'm inclined to bolt it on top and fabricate a shelf just for the dimpler. Otherwise it seems it will be too low to operate easily.
Has anyone solved this problem and have any ideas about better/worse ones?
How much does it help to have the carpeted support on either side of the dimpler?