I'm confused on next steps post ADSB-out installation. I have installed all DYNON equipment in my 6A and contacted tower for mode c check. Response was I was on their screen. What are my next steps for ADSB out? Do I need some type of documentation that ADSB functions properly? Thanks for all your help.